Progress Graphs - From 0% to 100%
Posted: Fri Jun 03, 2016 8:34 am
Can someone shed some light on this for me real quick?
Our owner wants to start putting up some KPI screens around showing goals and current stats. Along with the numerical data, he wants graphs in various forms (Bar, speedometer, etc) showing the progress from 0% to 100%. From what little i have seen, i will need to come up with a graph design that consists of 100 images (from 0% to 100%) and link those images with the data is that correct?
Does Noventri not have some generic progress graphs available for download or built-into Noventri Suite besides the single vertical bar graph in the tutorial?
Our owner wants to start putting up some KPI screens around showing goals and current stats. Along with the numerical data, he wants graphs in various forms (Bar, speedometer, etc) showing the progress from 0% to 100%. From what little i have seen, i will need to come up with a graph design that consists of 100 images (from 0% to 100%) and link those images with the data is that correct?
Does Noventri not have some generic progress graphs available for download or built-into Noventri Suite besides the single vertical bar graph in the tutorial?