Schedules Not Editable
Posted: Mon Jan 11, 2016 10:25 am
Perhaps I am misunderstanding the purpose of the scheduler, but this is what I'm experiencing:
I create a schedule, something like Mon-Fri, 6 am to 7 pm. I click the "Assign to Player/Group" button and everything goes smoothly. I save the schedule to the same name I've used before. The player starts playing the correct sequence.
However, even if I immediately click the "Edit" button at the top of the page, the very first schedule I saved as that name is loaded.
I try using the "Clear Workspace" button, recreating again, resaving again, and I still can't use the "Edit" button to load the latest version of the schedule.
Is this expected behavior and I'm missing something, or am I correct in that the Edit button should load the latest save I created?
I create a schedule, something like Mon-Fri, 6 am to 7 pm. I click the "Assign to Player/Group" button and everything goes smoothly. I save the schedule to the same name I've used before. The player starts playing the correct sequence.
However, even if I immediately click the "Edit" button at the top of the page, the very first schedule I saved as that name is loaded.
I try using the "Clear Workspace" button, recreating again, resaving again, and I still can't use the "Edit" button to load the latest version of the schedule.
Is this expected behavior and I'm missing something, or am I correct in that the Edit button should load the latest save I created?